Tuesday, July 21, 2009

Friday


When we came in the lab, and checked to see if the PVA had stretched since it was hanging over night. The results were nothing had changed. I spent the rest of the afternoon trying to come up with ways to stretch it. The weight we attached on the bottom part of the clamp was too heavy. when we dipped it in the water, it snapped in the middle. The weight was uneven.

I spent the last hour of work going up and down an elevator. Beth needed help for her experiment/project so I decided to be a volunteer. On the way to the first floor, I ran into Katie and she decided to join in on the fun. We pretty much went up and down about twenty times till Beth had all of her measurements. Thank god we didn't get stuck and surprisingly no one had to use the elevator.

No comments:

Post a Comment